FAQ Scope 12 inspection, Scope 12 inspection Arnhem
What needs to happen before a Scope 12 inspection can be carried out?
Before we perform a Scope 12 inspection, we first ask you to provide the necessary documentation. This includes the laying plan, cable plan, ballast plan, installation details, and also a load-bearing construction calculation.
These documents are essential to assess whether the PV installation is connected correctly. Once all the required documentation is received, we draw up an inspection plan. This plan gives you advance insight into the inspection process and what to expect. We then start the inspection.